![]()
With great appreciation we present the thoughts of our
customers...
Thank you Preston,
I will mail the cheque tomorrow.
It was really nice working with you and I hope we will get to work
together very soon.
Maz
Teddington Homes
www.teddingtonhomes.com
Just wanted to say thank you for your presentation
today. You certainly got our attention - hope we can do a project
together soon.
... and lunch was good too!
Gillian Haley
OAA MRAIC CAHP LEED AP
Goldsmith Borgal & Company Ltd
Architects
"Engineered Assemblies Inc., Praxy Cladding Corp., John Kubassek and Blair Davies are upstanding and involved members of the Toronto Construction Association. I would recommend them for construction work and other community building projects."
John G. Mollenhauer
President & CEO,
Toronto Construction
Association
"We are writing to confirm the outstanding service, technical experience, and innovative design of cladding systems we receive from the team at Engineered Assemblies Inc. With regard to our recently completed Sisters of Saint Joseph New Covenant Home, the primary experience of the building exterior is through the ribbon like curves through the cladding system we developed with the EAI team. Engineered Assemblies Inc. contributed immensely to its success through thorough product and material know-how, budgetary insight on the product and installation process, with reliable advice on envelope detailing producing one of the proudest projects our firm has completed. With their experience and service we would be extremely pleased in working with or recommending Engineered Assemblies Inc."
Bernard Jin
Senior Associate
Teeple Architects
"Acting as a Conract Administrator for a high design oriented architectural firm. Moriyama & Teshima Architects (MTA); receiving perfection from the trades that make our projects reality is paramount. I can say with great enthusiasm and extreme pleasure that Praxy Cladding Corp. (PCC) has brought this perfection forth to a project which at one point appeared to be a mis-fortune experience of events. Praxy Cladding Corp. was brought in half way through to complete the zinc cladding installation at the Queenston Plaza Phase 1 Redevelopment project which the original sub-contractor simply could not carry through and execute the quality that is expected on our projects. Working alongside with PCC's project managers and their on-site trades allowed us to resolve the numerous challenging site conditions that were left behind by the original sub-contractor. PCC's field staff is very professional, friendly and very proactive in proposing resolutions to challenging conditions. On a personal level, knowing the tradesmen responsible for executing the project have a "Master Roofer" old European school of training is a great feeling of assurance that the finished product will be of the quality as expected from MTA's high design standards.
"I can say with great confidence, that it has been a pleasure working with PCC. Their professional attitude towards quality and project schedule is above the rest. I hope you consider my recommendation of PCC for any of your future projects."
Karel Brozik, CSC
Moriyama & Teshima
"Our working relationship with the team at Engineered Assemblies has been a positive one from the start. Their involvement with the exterior wall system during design offered our Consultant team expertise that has proven to be very valuable particularly in identifying practical solutions to difficult interface areas with other building elements and adjacent structures. It has been a partnership approach that our entire team has embraced from the start. With our building having so many facades, including an inner core of four elevations being, and soffits clad with a cement panel system, staging proved to be a difficult challenge. Several trades were required in completing the building envelope and access for all related trades was required. Engineered Assemblies was one of those trades who offered ideas and solutions in choosing the best equipment necessary to complete the installation.
"The individuals assigned to our project were involved on a consistent basis and worked hand in hand with our site staff as well as their installers on site. A program was developed from day one which segmented the building elevations into individual areas which allows for efficient delivery of materials from framing to finished panel. Their site staff had great attention to detail which was very important in establishing the required panel joint lines and exhaust vent boxes being on the outside edge of panels.
"We look forward to furthering our relationship with Engineered Assemblies and would recommend their firm to others."
James Cameron
Project Manager
Bird Construction
"Engineered Assemblies has been very supportive. Through our mutual cooperation, we have successfully completed several projects that we are proud to have been a part of."
Victor Da Rosa
RITZ Metal 2000 Inc.
Dubbeldam Design Architects has used Engineered Assemblies’ Eternit and Parklex exterior cladding systems on several of our high end custom residential projects with great success. As a design practice that is known for its rigorous design process and follow through in construction, we were not only impressed by the range and excellent quality of the products, but also the high level of support we received from EA. Their assistance with technical issues and problem solving not to mention their quick response are an asset that has made them more of a partner than a vendor to our team. To date, their products have held up very well to the elements and we continue to specify EA for exterior cladding solutions as our first choice.
Heather Dubbeldam
B.Arch., OAA, MRAIC, LEED AP
DUBBELDAM DESIGN ARCHITECTS
www.dubbeldamarchitects.com
"I commend Engineered Assemblies and their manufacturing Partner, Parklex, in working with us professionally, patiently and with understanding attitudes to ensure a successful implementation at the Fredericton Convention Centre project. No doubt we will do business again sometime in the future."
Vernon MacKinnon
McPhee Commercial Cabinets Ltd.
e-mail: vmackinnon@mcpheecabinets.com
"Engineered Assemblies Inc recently completed the cladding of the University of Guelph's Addington Hall student residence. Through many challenges, changes, schedule restrictions and warranty concerns Engineered Assemblies continued to make completion of this successful project a high priority.
The end result is an exceptional looking building that will last many years into the future. Students, staff and the University as a whole continue to discuss what a great transformation this building has undergone, thanks to the products supplied and partially installed by Engineered Assemblies.
I look forward to working with Engineered Assemblies Inc. on future projects and would not hesitate to recommend this firm to others."
Sincerely,
Shane Danis, Project Manager
Univesity of Guelph, Physical Resources
"Engineered Assemblies was extremely helpful from the outset of
the project. As a premium cladding product we had not had
experience with previously, they were able to guide us through the
benefits and limitations of using Eternit including peer review of
our construction details and assistance with preparation of
specifications. This assistance was invaluable to our ability to
deliver the final design."
Thomas Wilson
B.E.S., B. Arch., O.A.A., M.R.A.I.C.
Senior Associate
+VG Architects
E: twilson@ventingroup.com










